Exscal Logo Dependable Distributed and Networked Systems

Teams and Responsibilities

Integrators - OSU ExScal teams

Project Lead: Anish Arora

Requirements:

Internal: Rajiv Ramnath, Anish Arora, Ted Herman, Mohamed Gouda, Sandeep Kulkarni
External: David Culler, Kenneth Parker, Vijay Raghavan, Norm Whitaker, Al Sciaretta

Architecture:

Overall: Anish Arora
Routing and initial clustering: Mohamed Gouda, Anish Arora
Time-sync, localization, clustering, GPS on mote: Ted Herman
Multi-hop reprogramming, TDMA: Sandeep Kulkarni
Simulation, visualization: Mikhail Nesterenko
Signal processing, hardware - antenna, battery, sensor, tier 1 and 2, go to Stargate: Emre Ertin
Tier-1 sensing autonomic behavior, hardware - motes, application, test-bed: Prabal Dutta, Ted Herman
Monitoring, test-bed execution: Sandip Bapat
Tier-2: Emre Ertin
Tier-2 Networking: Prasun Sinha, Anish Arora
Topology, power management, deployment: Santosh Kumar

Project/Process Management:

Internal: Rajiv Ramnath, Prabal Dutta, Vinod Kalathumani, Santosh Kumar, Mukundan Sridharan, Bill Leal, Ted Herman, Anish Arora
Logistics: Al Sciaretta, Bill Leal
External Project Management: Vijay Raghavan

Design and implementation teams:

Routing and initial clustering: Mohamed Gouda, Hongwei Zhang, Young-ri Choi
Time-sync: Ted Herman, Murat Demirbas
Localization: Ted Herman
Simulation and visualization: Mikhail Nesterenko, Vinod Kalathumani
Tier-1 - sensors, hardware: Prabal Dutta, Ted Herman, Emre Ertin
Monitoring: Sandip Bapat
Testbed: Vinayak Naik, Hui Cao, Prabal Dutta, Anish Arora, Rajiv Ramnath, Sandip Bapat, Mukundan Sridharan, Work-studies
Tier-2: Emre Ertin, Prasun Sinha, Vinayak Naik, Vinod Kalathumani, Anish Arora
Stargate hardware: Emre Ertin, Prabal Dutta
Power management: Santosh Kumar
Topology: Santosh Kumar
Application: Vinod Kalathumani, Emre Ertin, Prabal Dutta
Power management: Santosh Kumar
Multihop reprogramming: Sandeep Kulkarni, Anish Arora
Acoustics: Hui Cao

Technology Areas:

TDMA: Sandeep Kulkarni
Antenna: Emre Ertin
Battery: Emre Ertin
Sensors: Prabal Dutta
Signal processing: Emre Ertin

On-site liaisons:

Mohamed Gouda: Hongwei Zhang
Sandeep Kulkarni: Sandip Bapat
Mikhail Nesterenko: Vinod Kalathumani
Ted Herman: Murat Demirbas

Sponsors - DARPA

Vijay Raghavan, Joe Cross
Liaison: Rajiv Ramnath

Evaluators and facilitators:

MITRE (technical evaluators)

Alex Meng, Kenneth Parker

Puritan Research

Norm Whitaker

CACI

Project management: Larry Rohrbaug, Rajiv Ramnath

Contractors:

UC Berkeley:

Reprogramming over multihop network Tier 1, TinyOS support for sensors, new hardware, Network monitoring and management Tier 1 MAC: Sandip Bapat

Liaison: Sandeep Kulkarni
Other Liaison: Prabal Dutta

Crossbow:

XSM Mote (including. design, packaging, sensors, antenna, networking) Stargate device (including. ports, design, packaging, antenna, battery, networking, GPS) Schematics, board designs, Detailed experiment design and data for validation, H/W integration of mote with Stargate, Initial device programming, Support through end of demonstration

Contact: Mike Grimmer, Ren Thompson
Liaison: Prabal Dutta

UIUC (Urbana Champaign):

Localization, Interface to initial clustering, Interface to initial routing, GPS integration with Stargate

Contact: Gul Agha, Sameer Sundresh, Wooyoung Kim, YoungMin Kwon, Kirill Mechitov
Liaison: Ted Herman

UCLA:

Stargate (PDA) Tier-2 assistance networking, EMSTAR support for Stargate, Simulation-EMSTAR, EMView Visualizer support, Software integration support between Mote and Stargate

Contact: Mani Srivastava, Lewis Girod, Majid Sarrafzadeh, David Liu
Simulation Liaison: Mikhail Nesterenko
Tier-2 Liaison: Prasun Sinha

Intel:

Software integration support between Mote and Stargate

Contact: Phil Buanadana
Liaison: Emre Ertin

MITRE:

Acoustic signal processing, Evaluation and ongoing feedback to OSU

Acoustics Contact: Kenneth Parker
Evaluation Contact: Alex Meng
Detection and Auto-Calibration: Brian Flanagan
Acoustics Liaison: Hui Cao
Evaluation Liaison: Rajiv Ramnath
CNS - Al Sciaretta: Conops, Logistics Liaison: Rajiv Ramnath

WPAFB:

Mote storage, Physical mote layout at air force base, Medium-scale mote maintenance (500-1000), Reprogramming (possibly manual), Battery change

Contact: Juan Carbonnell
Liaison: Rajiv Ramnath

UT Austin (internal*):

Grid Routing

Liaison: Hongwei Zhang

OSU:

Space 4000 ft ceiling space, 1m separation, multiple thick sections, 3-4 supernode sections

Liaison: Rajiv Ramnath

Don Scott airport (internal*):

Mobile Control Center satellite hookup

Contact: Eric Barta
Liaison: Mukundan Sridharan

CIS:

System support

Liaison: Mukundan Sridharan

CAST:

Project management and s/w engineering,

Other Observers and potential participants: BBN, MIT, Parc, Raytheon

Valid XHTML 1.0! Copyright 2005 Exscal Research Group